Integrated project delivery (IPD)
Integrated project delivery (IPD) is a project delivery model built around a collaborative alliance of stakeholders who each share risk and reward. It involves the key project stakeholders (the client, architect, contractor, and so on) entering into a single contract that encourages collaboration, optimises results, reduces waste and maximises efficiency and expertise.
The stakeholders collectively determine project goals, budgets, allocation of risk and compensation. The contract typically specifies the separate responsibilities of the stakeholders but enshrines collective responsibility for the project’s successful delivery.
The IPD contract agreement is typically signed by a ‘leadership team’ comprising the client, lead designer/architect and contractor. They are primarily responsible for delivering the project to the budget, schedule and quality specified by the client. Subcontractors and other stakeholders may agree to become ‘risk/reward partners’ (or they can be contracted on conventional sub-contract agreements).
Risk/reward partners agree to be reimbursed on a cost plus overhead and profit basis if the project performs well. The profit is fixed as a lump sum amount at the point at which the contract amount is negotiated and agreed by the stakeholders. The risk/reward partners may lose some or all of their profit if the project falls behind the budget or schedule, and the contract will lay out the terms of this loss. It is usual for the client to agree to pay for the project at cost if all profit is lost, thereby allowing stakeholders to limit their losses purely to the profit they would otherwise have earned on the project.
The benefit of the IPD method is that the contract removes barriers to collaboration and innovation, combining incentives for the project team as a whole rather than having them seek increased profits from the project individually. Instead of individual successes or failures, the overall outcomes determine the collective rewards.
By openly sharing the project goals, risk and rewards, this can result in a more dependable flow of information between the main parties, leading to a sharing of knowledge and technology. In addition, the project can benefit from being able to adopt lean construction principles, overlapping design and construction phases, and so on.
[edit] Related articles on Designing Buildings Wiki
- Collaborative practices.
- Consortium.
- Construction contract.
- Construction manager at-risk.
- Construction management contract.
- Construction project.
- Design and build.
- Integrated project team.
- Integrated supply team.
- Just-in-time manufacturing.
- Joint venture.
- Kanban.
- Lean construction.
- Managing the procurement process.
- Partnership.
- Procurement route.
- Tender process.
Featured articles and news
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.